Thursday, August 6, 2009

It's been a hard week with Chris in and out, and a broken foot. We got James' YJ cage done. It's painted, installed, seats and harnesses are in.

Last friday, ted and I pulled the cummins out of the donor truck for Jake's 12V Suburban project.

Chris was able to finish the seat cage in John's Boyd's Jeepspeed and it looks very pro.

Eric has replaced struts, tie rod ends, ball joints, and a front diff in John Lloyd's 02 Tundra. The 4" Tuff Country suspension made things a bit more difficult.

Ted replaced a starter, battey, flywheel and epaired the wiring in Scott's FJ60 with a Chevy 350. On tuesday, Ted did a leveling kit on tommy's 09 tundra. He is also in the process of regearing a Scout 44 with an ARB.

Tomorrow Eric will work on an XJ brake system and driveshaft. Ted will work on Aaron's YJ stalling issue, a vaccum problem in my old F150, and possibly tune a water injection system on a TJ.

If Chris can make it in, we'll start on the Suburban's rear shackle flip.